Sitara Chemical Industries- 35 MW Coal Power PlantBack to Projects

Sitara Finished

Project Description

Scope of Work: Main Contractor of Civil Works + Pre Engineered Steel Building Supply

Project Completion: 2016

Project Location: Faisalabad

Duration of Project: 18 months

Sitara Chemical Industries Ltd.- SCIL-  was incorporated in 1981 and began producing caustic soda in 1985, initially at a rate of 30 metric tons a day. The plant’s capacity was gradually increased over years to current level of 610 metric tons a day. In addition, various by-product facilities have been added and expanded from time to time to cope with growing demand. Company entered into Textile Spinning Business in 1995. Its specialty chemicals and export division was established in 2001 and agri-chemicals division in 2003 and is now one of the largest Groups in Pakistan.

CPEC is a strategic game changer for Pakistan. This economic corridor is intended to rapidly expand and upgrade Pakistan’s infrastructure, as well as deepen and broaden economic links with China. Considering the geostrategic impact of CPEC, SCIL installed a new state-of-the-art and Coal Fired Power Plant in Faisalabad. Banu Mukhtar Contracting (Pvt.) Ltd was selected as the construction partner for this prestigious project.

Our scope of work comprised the Civil Works for 40 MW Power Plant which was inaugurated and highly appreciated by the honorable Prime Minister of Pakistan on September 3, 2016. Main Power House, 80 meters high Chimney, Cooling Tower, Neutralization Pits, Reactor Pits, Area Development and Boundary wall were all the components of Project.

The work was completed to the complete satisfaction of Client as well as the Design Teams of Chinese Origin. The Production of Electricity is in progress achieving all the milestones of success.

Inauguration Ceremony Inauguration Ceremony Mian Muhammad Nawaz Sharif giving compliments to the Entire Team
Project Accomplished Project Accomplished Prime Mister Of Pakistan at Project Site
Sitara Chemical Industries Sitara Chemical Industries Project Under Construction
Project Under construction Project Under construction Slip forming technique was used to complete the civil works of Chimney in 90 days
35 MW Coal Fired Power Plant 35 MW Coal Fired Power Plant Porject at Final Stages of Completion
SCIL Coal Fired Power Plant SCIL Coal Fired Power Plant Coverage in Local News Papers

Head Office Lahore

Banu Mukhtar, 5-A Ali Block New Garden Town, Lahore Pakistan

  • Fax: (042) 35846653
  • Email: lhe@banumukhtar.com
  • UAN: +92 42 111-212-111

Area Office Karachi

45-H, Block 6, P.E.C.H.S, Off Shahra-e-Faisal, Karachi.

  • Fax: (021) 34310983)
  • Email: khi@banumukhtar.com
  • UAN: +92 21 111-212-111

Area Office Islamabad

G.T. Road, Motorway Chowk/ Peshawar Mor, Islamabad.

  • Email: isb@banumukhtar.com
  • UAN: +92 051 111-212-111

Sales Offices

  • Faisalabad: +92 300 8662384
  • Multan:        +92 345 8711220
  • Peshawar:   +92 303 4449836
  • Hattar:         +92 303 4441701
  • Texila:          +92 334 5121999